Podgorica
Year: 2004
Team: Author - Prof. Dr. Mladen Ulićević, dig; Constructor on the project - Jovo Popović, MA, dig
Surface area: The bridge is 173 m long, and the pylon rises 57 m above the road. Twelve cables carry the pavement structure, while another twenty-four are attached to counterweights.
Investor: The capital Podgorica
Status: Major project / Realized
Category: Traffic infrastructure facility